- Frequently Asked Questions – Meadowlake Industrial Park

What makes Meadowlake different from other industrial parks?

1

Meadowlake is developed by a team that prioritizes communication, speed, quality, and long-term relationships. We design everything in-house, guide clients through financing and planning, and focus on creating high-quality buildings that serve as lasting investments for both owners and the surrounding business community.


Yes. We offer full in-house design, 3D renderings, and construction services. Our team manages the entire process from concept through completion, providing daily onsite oversight and a single point of accountability.

Do you provide design and construction services?

2


Lots at Meadowlake Industrial Park are available for purchase or through a build-to-suit lease structure. Buyers can either acquire land and build their own facility or work with our in-house team to design and construct a custom building.

Are lots for sale or lease at Meadowlake Industrial Park?

3


We do not offer owner financing. However, we work with a preferred local lender experienced in industrial projects, and buyers are welcome to use their own bank or financing source.

Do you offer owner financing?

4


Most buildings start around 6,000 square feet, with a common footprint of 60’ x 100’. A single 1-acre lot can typically accommodate buildings ranging from approximately 60’ x 80’ up to 80’ x 150’. Lots can also be combined for larger projects. Current developments include buildings up to 20,000+ square feet, and larger sites can support facilities of nearly any size.

What size buildings can be built at Meadowlake?

5


How long does the development process take?

6

The Oklahoma City permitting process typically takes about 30 days from plan submission to approval. Construction timelines for a standard industrial building generally range from 6 to 10 months, depending on building size and engineering requirements.


What utilities are available?

7

Meadowlake Industrial Park offers:

  • Electric: OG&E

  • Water: City of Oklahoma City

  • Gas: ONG

  • Fiber Internet: OEC Fiber

  • Wastewater: Septic or aerobic systems (no municipal sewer)


Is the property in a floodplain?

8

No. All lots at Meadowlake are outside the floodplain, and the park already has master stormwater detention in place, meaning future developments do not need to build their own on-site detention systems.


What types of businesses are allowed?

9

Meadowlake is zoned I-2 Industrial, allowing a wide range of uses including contractors, manufacturing, warehousing, automotive, and trade-based operations. Cannabis-related businesses and salvage/scrap operations are not permitted.


Is outdoor storage allowed?

10

Outdoor storage is permitted but must be located within a secured, privately fenced area to maintain the overall quality and appearance of the park.


Are there architectural requirements?

11

Yes. All buildings must meet modern architectural guidelines and be compatible with existing developments. Front entrances are required to include brick wainscoting, and all projects are encouraged to maintain a high-quality office finish.